    Featured Case Studies

    The Proof Behind the Projects

    From emergency switchboards to custom PDUs, LFG delivers purpose-built electrical solutions across markets—on timelines others won't touch.

    Cherry-Lane-Case-Study-Thumbnail
    Denver, Colorado

    Cherry Lane

    Six Weeks to Restore Critical Power

    A subcontractor's drilling operation gone wrong sparked a major electrical fire at Cherry Lane—cutting power not only to the residential high-rise under construction in one of Denver's most affluent neighborhoods, but to an adjacent Whole Foods among the busiest in the country. With generators burning through costs by the day, permanent restoration couldn't wait. LFG compressed a typical year-long lead time into six weeks—mobilizing design teams, field leaders, and project managers to manufacture and deliver replacement switchboards when every hour counted.

     

    Waldorf-Astoria-Case-Study-LFG
    Miami, Florida

    Waldorf Astoria

    7 Switchboards, Timed for Installation 

    When one of Miami's most high-profile hospitality projects called for switchgear, LFG delivered on quality and coordination. This seven-board, 18-section ABB package demonstrated LFG's ability to work across manufacturer relationships without missing a beat. As much as the build itself, the project tested scheduling discipline: rather than rushing boards into storage prematurely, LFG worked backward from project's delivery schedule—protecting the client from unnecessary storage costs and ensuring equipment arrived in pristine condition, ready for install.

    Royal-Caribbean-HQ-Case-Study-LFG
    Miami, Florida

    Royal Caribbean HQ

    From 40-Week Delay to Four-Week Delivery

    When Royal Caribbean's headquarters faced a power distribution crisis after their supplier issued a 30–40-week delay letter, LFG stepped in with a solution engineered and delivered in four weeks. The team designed a custom Power Distribution Unit—combining a 480V switchboard with an external step-down transformer configured to fit within the site's tight spatial constraints. LFG turned around the design in under two days, leveraging strategic on-hand inventory of breakers, steel, and copper to begin manufacturing immediately. The result: a fully operational system delivered and installed while the original supplier's lead time was still months out.

     

    Willets-Point-Case-Study-LFG
    Queens, New York

    Willets Point

    Simplifying Utility Separation Through Custom Engineering

    In New York multifamily projects, building owners often must provide and pay for electric heat while tenants cover their own air conditioning. Traditional solutions like submetering or field-installed relay systems add significant cost and labor. LFG engineered a factory-built control panel that separates landlord-paid heating from tenant-paid cooling—a simpler, more cost-effective solution. Designed and manufactured entirely in-house, the prototype was developed and approved in under a month, with production scaling to deliver 800 units across a five-month phased rollout aligned with the construction schedule.

    .

    Dallas-Uptown-Hotel-Case-Study-LFG
    Dallas, Texas

    Dallas Metro Hotel

    Installer Verification That Protected Budget and Schedule

    On a fast-moving hotel project in Dallas, LFG's installer verification process became a quiet differentiator. By confirming field conditions and installation details early, the team identified opportunities to shift plans before they became costly change orders—keeping the schedule tight and the budget intact. Working in close coordination with the design team, LFG moved swiftly to align production with real-world site conditions, turning what could have been reactive problem-solving into proactive partnership.

     

    LFG was competitive with pricing from what I’ve seen in the industry—everything that they said they were going to deliver, they did.

    G.C. Partner // Atlanta, Georgia

    LFG was communicative with us on what our options were. They presented several and timeframe was of the essence—that's ultimately why we went with LFG.

    G.C. Partner // Denver, Colorado

    You guys have done an excellent job with power. We have permanent power, and we've done it as a team. The manufactured switchgear turned out excellent.

    G.C. Partner // Naples, Florida

    Your team really stepped up to help us… providing power and expediting a replacement. We got the attention when we needed it, which is very important when you’re dealing with something potentially project delay worthy.

    G.C. Partner // Alexandria, Virginia

    LFG understood what our issues were and they were able to provide a great solution—they stepped in and designed and procured and fabricated a product in a very timely manner to get us out of a bad deal.

    G.C. Partner // Denver, Colorado